DJ-MN: BET-CON (ROBG-375)

Dolj – Montana: Joint steps for a better connectivity

What’s the goal?

The overall objective of the project is to improve the development and coordination of cross-border transport systems for better connections to TEN-T network from Dolj and Montana counties.

What’s the budget?

7,689,268.62 euro, out of which 6,535,878.32 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Territorial Administrative Unit - Dolj County (Romania)

Beneficiary 2 (B2): Road Infrastructure Agency (Bulgaria)

When is it happening?

Start date: 11.07.2018

End date: 31.12.2023

Duration: 65 months and 21days

Where is it happening?

Dolj in Romania

Montana in Bulgaria

How is it going to happen?                      

  • A road map of Dolj and Montana highlighting the black spots on the roads
  • Awareness campaign for speed managing and human tolerance on roads
  • Technical Design and technical assistance from the designer
  • Upgrading works for a section of the road DJ 561 B
  • Upgrading works for a section of the Road II-81 Kostinbrod-Berkovitsa-Montana
  • Works Supervision services for both LB and B2
  • A common traffic safety system consisting of 8 solar radar speed signs Public events

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 19.84 km of upgraded road, 3 joint mechanisms to facilitate the connection of tertiary nodes to TEN-T infrastructure

Programme results: 13,546 people served by modernized infrastructure leading to TEN-T

Project status

The project is completed

Lead Beneficiary:

The execution works were completed, and the reception for the investment objective of LB "Modernization of County Road DJ 561B, km.12+130 - 24+260" was carried out on 15.01.2024. The Solar radar panels were installed on the modernized road. The Solar radar panels are used to calm the speed, thus contributing to increase the degree of safety on the upgraded road sector within the project. Also, within the project, the road map of Dolj County and Montana District was made, which aims to highlight the black spots on the roads in order to warn drivers about possible accidents. This was printed in 500 copies being used in dissemination activities.

Beneficiary 2:

Construction work for the investment objective of B2 "Improvement of Road II-81 from km 86+289 to km 94+000" is completed. The authorization to use the modernized road was issued on 01.02.2022. Also, on the modernized road sector, 4 solar radar panels were installed to measure and display speed, with the same aim of increasing traffic safety.

aDiGiPARKS (ROBG-378)

“Creating an innovative and integrated cross-border tourist product between “Vrachanski Balkan” and “Iron Gate” natural parks”

What’s the goal?

The overall objective of the project is to promote the joint sustainable and balanced economic development of the territories of “Vrachanski Balkan” and “Iron Gate” natural parks” through diversification of tourism supply and development of tourism based on cultural and natural heritage as a factor for effective use and exploitation of common advantages and potentials and overcoming imbalances in the region.

What’s the budget?

419,379.44 euro, out of which 356,472.52 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Administration of Natural Park “Vrachanski Balkan” (Bulgaria)

Beneficiary 2 (B2): N.F.A. Romsilva – Iron Gates Natural Park R.A. (Romania)

When is it happening?

Start date: 21.05.2019

End date: 19.06.2023

Duration: 48 months and 30 days

Where is it happening?

Vratsa District in Bulgaria

Mehedinti County in Romania

How is it going to happen?

  • Creation of a strategy and developing a tourist product;
  • Creation of a joint integrated innovative tourist product – Cross-Border destination for tourism, based on cultural and natural heritage and performed promotion of a common positive image of two natural parks through modern 3D technologies;
  • Building up a Cross-Border network, uniting all the interested parties and a developed capacity for joint strategic planning, management and sustainable development of tourism, growth of the tourist visits and the revenues from tourism in the two parks;
  • Repairs and preparations of premises for demonstration digital halls.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: One common strategy, policy or management plans for valorizing (including raising awareness) the cultural and natural heritage through its restoration and promotion for sustainable economic uses; One integrated tourism product/service; 15,000 expected number of visits to supported sites of cultural and natural heritage.

Programme results: 12,000 tourist overnights in the Cross-Border region.

Project status

The project is finalized.

Lead Beneficiary:

It was elaborated the Preliminary study for identification of the most attractive pilots sites for digitization in Vrachansk Balkan Natural Park. The study proposed 15 objects for digitization, including nature sites, cultural sites and eco trails in the both parks.

LB finalized the digitization of the territory of “Vrachanski Balkan” Natural Park, performing aerial photogrammetric and 8 of sites were selected. The “Visitors Centers Natura” in Vratsa was renovated.

The web platform of the project was developed at https://digiparks.eu/.

Also, the Strategy and Action plan for digitalization of the heritage in both parks were finalized.

Beneficiary 2:

It was elaborated the Preliminary study for identification of the most attractive pilots sites for digitization in Iron Gates Natural Park and 7 of them were selected.

The beneficiary completed the digitization of the territory of the “Iron Gates” National Park, performing aerial photogrammetric inspections and the repair of the Documentation and Information Center in Dubova.

                                                                                                   

JAMP (ROBG- 384)

Joint Adventure on the Mountain Paths

What’s the goal?                                              

The overall objective of the project is to support the sustainable development of the cross-border tourism from Romania and Bulgaria and to increase the promotion of the mountain area from Mehedinti, Vidin and Montana.

What’s the budget?

490,320.81 euro, out of which 416,772.68 euro ERDF

Who?

Lead Beneficiary (LB): Romanian Association for Electronic and Software Industry - Oltenia Subsidiary (Romania)

Beneficiary 2 (B2): Agency for Regional Development and Business Center – Vidin (Bulgaria)

Beneficiary 3 (B3): Regional Development Agency and Business Center 2000 (Bulgaria)

When?

Start date: 23.08.2018

End date: 22.01.2020

Duration: 18 months

Where?

Mehedinti in Romania

Vidin and Montana in Bulgaria

How?

  • Studies for identifying the types of trails for mountain electric bikes;
  • Common Marketing Strategy for the identified trails for mountain electric bikes in Mehedinti, Vidin and Montana;
  • Acquisition of 150 of the mountain electrical bikes with GPS;
  • Organization of seminars with the stakeholders;
  • Organization of joint trainings for e-bike maintenance with the selected operators: 1 in Ro and 1 in Bg;
  • Information and publicity campaign;
  • Organization of joint info-tour to promote tourism with mountain electric bikes
  • Participation at tourism fairs in Sofia and Bucharest.

Results (what’s the contribution to the Programme)?

Programme outputs: 4 common strategies for valorizing the cultural and natural heritage through its restoration and promotion for sustainable economic uses, 2 integrated tourism products created; 180 visits to supported sites of cultural and natural heritage and attraction

Programme result: 849 tourist overnights in the CBC region

Project status:

The project is finalized, with the following results:

- The Studies for identifying the types of trails for mountain electric bikes in the county of Mehedinti, Romania and districts of Vidin and Montana, Bulgaria, were elaborated by each project partner. They are available on their website: www.jamprobg.eu.

- The Common Marketing Strategy for the identified trails for mountain electric bikes in Mehedinti, Vidin and Montana has been elaborated and translated in Bulgarian and English languages and it is available at www.jamprobg.eu.

-Each project partner purchased 50 mountain electric bicycles transferred to the final operators.

- The project website: www.jamprobg.euis available in BG, EN and RO.

- The application for mobile devices has been elaborated and it is available in the AppStore and Google Play by the name “jamprobg bike app”.

BC-TENT (ROBG-383)

Better connected secondary and tertiary nodes to TEN-T core and comprehensive network through joint CBC measures

What’s the goal?

The project main objective is to improve traffic conditions, safety and conductivity between secondary and tertiary nodes and core TEN-T infrastructure in the cross border area through the modernization of 5.087 km of local and regional roads of cross-border importance.

What’s the budget?

4,769,687.25 euro, out of which 4,054,234.14 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Veliko Tarnovo Municipality (Bulgaria)

Beneficiary 2 (B2): Territorial Administrative Unit Calafat Municipality (Romania)

Beneficiary 3 (B3): Future Today Association (Bulgaria)

When is it happening?

Start date: 10.12.2019

End date: 31.12.2023

Duration: 48 months and 22 days

Where is it happening?

Vidin, Veliko Tarnovo in Bulgaria

Calafat, Dolj County in Romania

How is it going to happen?

  • Modernization of 5.087 km of local and regional roads of cross-border importance, which directly connect the secondary and tertiary nodes on both sides of the Danube to the basic TEN-T infrastructure;
  • Coordinating the mechanisms for overcoming the new common challenges arising from the operation of the core TEN-T infrastructure on Pan European corridors 4, 8 and 9;
  • Organizing awareness-raising activities with the support of NGOs for the safety of citizens in places where the heavy burden of road traffic meets the local population.

What will be the results (what’s the contribution to the Programme)?

Programme outputs:

- 5.087 km of reconstructed or modernized roads;

- 3 common mechanisms to facilitate the connection of secondary / tertiary nodes to the TEN-T infrastructure, namely: Elaboration of a traffic safety measures report, applying route guidance and implementation of an awareness raising campaign of safety.

Programme results:

- 85,854 cross-border population served by modernized infrastructure leading to TEN-T.

Project status

Current Project Status:

The implementation period of the project ended on 31.12.2023, but because of the delays registered at the investment activity of LB, the project was included on the list of non-functional projects. The new completion date of the project is 31.12.2024.

The investment objective of LB is divided in 3 sub-sites. The opening of sub-site no. 1is expected to take place on 16th of September 2024, while the construction works are foreseen to be finalized on 20th of December 2024. The construction works for sub-sites no. 2 regarding the street network and no. 3 with the 2 bridges are almost completed. Following the modernization of 1.4 km of road in Veliko Tarnovo, LB reported a number of 76,811 persons served by the modernized infrastructure for the Result indicator.

B2 finalized the construction works on his behalf and reported as achieved 0.51 km of modernized roads in Calafat. The reception at the end of the construction works on behalf of B2 took place on 21st of September 2023. In addition, B2 reported a value of 16,809 people served by the modernized Jiului Street for the Result indicator.

B3 finalized the implementation of 2 joint mechanisms to facilitate the connection of secondary/tertiary nodes to TEN-T infrastructure, namely the awareness raising campaign on safety and the traffic safety measures mechanism. The report on traffic safety measures can be found at the following links:

1.https://www.vidin.tv/?p=13223

2.https://lachezara-tv.eu/bg/2023/06/01/

 3.https://veliko-tarnovo.bg/bg/evrofinansirane/mezhdunarodni-proekti-s-uchastieto-na-obshtina-veliko-tarnovo/proekt-po-dobre-svrzani-vtorichni-i-tretichni-tochki-v-glavnata-mrezha/.

On 26.08.2024, respectively 29.08.2024, B3 organized 2 informative events entitled “Project ROBG-383 Horizons: A Journey Through Aims to Accomplishments” in Ruzhintsi and Veliko Tarnovo.

CIVILSAFETY (ROBG-393)

Integrated risk management and efficient reactions of authorities for civil safety

What’s the goal?

The main overall objective of the project is to increase cross border cooperation in emergency prevention and intervention of authorities and to develop infrastructure and joint services to prevent natural and technological disasters, in the same time with developing the capacity to react quickly to threats to the health and integrity of citizens and goods, in order to ensure a safe area, a sustainable development and an increase in the standard of living of the population.

What’s the budget?

988,827.18 euro, out of which 840,503.09 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Territorial Administrative Unit Ovidiu Town (Romania) - 420,897.40 euro

Beneficiary 2 (B2): Shabla Municipality (Bulgaria) – 409,407.64 euro

Beneficiary 3 (B3): Idein Development Foundation (Bulgaria) – 158,522.14 euro

When is it happening?

Start date: 24.07.2018

End date: 23.04.2021

Duration: 33 months

Where is it happening?

Ruse, Dobrich, Constanta

How is it going to happen?                        

  •    Acquisition of special equipment for alerting the population in emergency situations, such as earthquakes, fires;
  •    Development of joint hazard maps;
  •    Organization of trainings and best practice sessions;
  •    Dissemination of information to ensure the increase of public awareness with regard to the protection measures in emergency situation;

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 18,711 people benefiting from actions of risk management; 18,711 people benefiting from flood protection measures; 5,580 people benefiting from forest fire protection measures

Programme results: increase of the quality of the joint risk management in the CBC area

Project status

The Project has been finalized and the main achievements are as follows:

- A vehicle for fire intervention, an ambulance, a vehicle for the transport of 10 or more persons and a rescue boat have been delivered to the LB along with a special equipment for alerting the population in emergency situations, such as earthquakes and fires, all of the equipment is foreseen to be used in case of emergencies, such as floods fires earth quakes, by the volunteers on behalf of LB;

- A rescue boat and a special vehicle for intervention in snowstorms and floods have been delivered to B2, all of the equipment is foreseen to be used in case of emergencies, such as floods fires earth quakes, by the volunteers on behalf of B2;

- The Hazard Maps has been fully developed and can be found at www.hazmaps.eu;

- The volunteers team of 10 persons has been appointed at LB and B2 level and the equipment foreseen within the project for them, in order to be able to communicate between them, receive alerts on cell phones from the warning system, observe and store data from the hazard maps, as well as to be used in trainings and workshops, have been delivered. The trainings of the teams have been organised and performed by the B3.

Pictures

September 2024
Mo Tu We Th Fr Sa Su
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.