Ceilings

The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 20.10.2020, which can be downloaded here.

For the previous ceilings of expenditures which are no longer in force - Version 4, used when drafting the full application forms under the third call for proposals, Version 5 in force since 10th of January 2018 and Version 6 in force since 24th of February 2020 click here (EXCEL/ PDF).

For the previous ceilings of expenditures which are no longer in force but were used when drafting the applications – Version 1, 2 and 3 click here (EXCEL/ PDF).

The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 14.02.2023, which can be downloaded here.

 

 

Pictures

July 2026
Mo Tu We Th Fr Sa Su
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2