The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 20.10.2020, which can be downloaded here.
For the previous ceilings of expenditures which are no longer in force - Version 4, used when drafting the full application forms under the third call for proposals, Version 5 in force since 10th of January 2018 and Version 6 in force since 24th of February 2020 click here (EXCEL/ PDF).
For the previous ceilings of expenditures which are no longer in force but were used when drafting the applications – Version 1, 2 and 3 click here (EXCEL/ PDF).
The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 14.02.2023, which can be downloaded here.