Slide background
Slide background
Slide background

W-TEN (ROBG-440)

Well connected nodes Giurgiu - Borovo to TEN-T transport network

What’s the goal?

The common challenge approached by the project is to improve the accessibility and mobility to the TEN-T network and thus to create suitable conditions for sustainable development in the border area.

What’s the budget?

4,945,538.25 euro, out of which 4,236,007.56 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Giurgiu County

Beneficiary 2 (B2): Borovo Municipality

When is it happening?

Start date: 01.08.2019

End date: 31.12.2023

Duration: 53 months

Where is it happening?

Ruse (Bulgaria)

Giurgiu (Romania)

How is it going to happen?

  • Integrated information and awareness system;
  • Joint traffic management system and awareness;
  • Modernization of DJ 601: Bolintin Vale – Malu;
  • Works in Borovo Municipality.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: - Modernized transport infrastructure providing access to the TEN-T network (Total length of reconstructed or upgraded roads 11.73 km.);

- 2 joint mechanisms to facilitate the connection of secondary/tertiary nodes to TEN-T infrastructure

Programme results: Cross border population served by modernized infrastructure leading to TEN-T – more than 20,877 inhabitants.

Project status

Current Project Status:

The implementation period of the project ended on 31.12.2023, but because of delays registered in the investment activity of LB, the project was included on the list of un-finalized projects. The new completion date of the project is 31.08.2024.

B2 has finalized the modernization works for the rehabilitation of 4.32 km from the street network in Borovo.

The LB signed the contract for design services and works execution for the investment objective „Modernization of DJ 601: Bolintin Vale – Malu Spart DN61, km 13+685 – km 14+184 and km 22+263 – km 29+221, 7.45kmon 18.10.2022 with a design period of 30 days and a construction period of 12 months. The order to start the construction works was given on 25.05.2023, in order to begin the construction works on 29.05.2023. According to the information provided by LB, the construction works are ongoing and 7.416 km of modernized roads in Giurgiu were reported by LB, having in mind that the roadway was finalized and is open to traffic. On 27.11.2023, LB organized the Conference “New opportunities for traffic management and traffic safety measures in Giurgiu-Borovo” in Giurgiu.

B2 had elaborated the study „New opportunities for traffic management and traffic safety measures in Giurgiu-Borovo area”. The study examined the state of transport infrastructure in the cross-border region, identified affected areas, made a SWOT analysis of the current situation, a risk analysis related to optimizing transport conditions in the cross-border region Borovo - Giurgiu, review of applicable regulations in Bulgaria and Romania defining the institutional responsibilities of the authorities regarding transport conditions and traffic safety by analyzing their role in the whole process.

The interactive map and the smartphone application are available for free on Google play and App store under the name “Borovo Blackspots”. The map is available in Bulgarian, English and Romanian and it contains the locations of the black spots https://w-ten.info/?ait-items=blackspot-locations&lang=en.

The application allows a user to report a new accident and it also promotes important touristic objectives, which can be visited by potential tourists coming to the area and it promotes the rules of traffic safety.

B2 elaborated the Traffic Management Plan and acquisioned equipment on his behalf for the traffic monitoring system in order to realize a functional information system for traffic monitoring. In addition, LB purchased equipment for the traffic management system and put it onto operation on 23.11.2023. The Joint traffic management system developed by the project’s beneficiaries is functional and can be accessed at https://wtentraffic.eu/.

On 24.11.2023, B2 organized the Conference “New opportunities for traffic management and traffic safety measures in Giurgiu-Borovo” and the Workshop „How to improve the traffic safety measures within the Giurgiu Borovo cross-border area?” in the town of Borovo. The closing press conference on behalf of B2 took place on 11.12.2023 on Borovo with 50 participants. B2 implemented also the traffic awareness activities and developed the promotional materials (leaflets, posters).

ARTOUR (ROBG-368)

Active art for attractive tourism

What’s the goal?

ARTOUR project aims at creating a thematic art & culture events tourist product based on the natural and cultural heritage in order to promote the CBC region as more attractive tourist destination and better use the potential of the tourism on the lower Danube.

What’s the budget?

454 130.10 euro, out of which 386,010.58 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Association "Institute for Territorial Innovations and Cooperation - ITIC"

Beneficiary 2 (B2): Valahia Transalpina Professional Association

When is it happening?

Start date: 06.09.2018

End date: 05.03.2020

Duration: 18 Months

Where is it happening?

Calarasi, Drobeta - Turnu Severin, Giurgiu, Constanta – in Romania

Vidin, Ruse, Silistra – in Bulgaria

How is it going to happen?

  • Conducting a study of potential application of art & culture tourist product and services in the CBC region;
  • Close consultations with the key stakeholders in identifying particular artists, traditions and sites so that high-quality art & culture tourist product, services and animation can be delivered;
  • Development of joint thematic art & culture tourist product with art animation and programme for its pilot implementation in the course of the project;
  • Organizing 4 art & culture tourist events as plain-air festivals over three (3) days with the participation of artists (painters, dancers, singers, actors) who will make live presentations of their arts (2 in BG and 2 in RO) for pilot implementation of the thematic art & culture tourist product according to the elaborated programme;
  • Analysis of the pilot implementation of the thematic art & culture tourist product and elaboration of 5-year programme for its implementation after the project completion;
  • Development of promotional webpage of the newly created thematic art & culture tourist product and undertaking a wide promotional online and media campaign.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: a study of potential application of art & culture tourist product and services in the CBC region; one thematic art & culture events tourist product created with art animation and programme; 4 art & culture tourist events with animation (2 in BG and 2 in RO) organized as part of the thematic art & culture tourist product; 5-year programme developed for implementation of the thematic art & culture tourist product; promotional website of the thematic art & culture tourist product launched.

Programme results: increase of the number of overnights in the CBC area with 10.000

Project status

The project implementation was finalized.

The following results have been achieved:

- An analysis of information and study of the potential application of the tourist product "Art&Culture", was elaborated;

- The joint thematic art & culture tourist product with art animation and programme for its pilot implementation in the course of the project, were elaborated and reviewed by 2 external experts appointed by the LB in the period 14.01-13.02.2020. LB accepted the art & culture tourist product with a 5-year programme for its implementation on 13.02.2020;

- 4 art & culture tourist events such as: plain-air festivals over three (3) days with the participation of artists (painters, dancers, singers, actors) who made live presentations of their arts for pilot implementation of the thematic art & culture tourist product, were organized;

- 2 short promo videos (30” – 1’) and 2 professional videos (up to 10’) for the plain-air events organized in Bulgaria were produced by Mi Art Stream Ltd. and uploaded on the project website and Facebook page. The videos were finally accepted by the LB on 05.12.2019;

- The project Facebook page, available at the link https://www.facebook.com/Artour-110410830299202/ and the project website, available at the link https://artour-robg.eu, were developed;

- Evaluation of the pilot application of the art & culture tourist product was made in the period 30.10.19-30.12.2019 by KPM Consulting Ltd. appointed by the LB. The Analysis and evaluation report were accepted by the LB on 10.01.2020.

- Final conference was organized and held in Vidin on the 27th and 28th of February 2020 for 30 participants from BG and RO.

NAVY–T WAY (ROBG–478)

Improving safety of navigability on Danube River in the Calarasi – Silistra cross – border region

What’s the goal?

To improve the infrastructure on the both sides of the Danube river in order to maintain the navigability on the Danube.

What’s the budget?

5,946,041.76 euro, out of which 5.054.135.48 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Territorial Administrative Unit – Calarasi County

Beneficiary 2 (B2): Silistra Municipality

Beneficiary 3 (B3): Territorial Administrative Unit – Calarasi Town

When is it happening?

Start date: 30.03.2019

End date: 31.05.2024

Duration: 62 months and 2 days

Where is it happening?

Silistra in Bulgaria

Calarasi in Romania

How is it going to happen?

  • Strategies and action plans to improve the safety of the navigation on the Danube;
  • Works in Calarasi County – to facilitate the direct access of the boat owners from one community to another, offering an open area of ​​navigation on the inside Borcea arm;
  • Works in Silistra District – rehabilitation of Riverside fortification walls;
  • Promotional activities focus on providing project information, transparency and effective communication with stakeholders, as well as presenting the results of project activities and target groups and local stakeholders working in the cross-border region;
  • The transport waterway between Calarasi and Silistra will be improved by installing beacons on 5 km inland waterway on the Borcea – secondary arm of Danube. Two river station will be developed, one for each side of the Danube. Two river buses of medium size will be purchase for passengers transportation.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: Total length of new and improved inland waterway – 11 km;

Programme results: 2.34 % of the RO-BG CBC Danube length and Black Sea where safety of the navigation have been improved.

Project status

The project implementation period was completed on 31.12.2023, but due to the fact that, the investment works were not completed, the project was included on the list of non-functional projects, with a new completion date of 31.05.2024.

The following results have been reported so far:

LB – The contract for the technical design was signed (investments for Borcea arm). The Start Order for elaboration of the Technical Project was issued in the middle of November 2020. The development of the Technical Project together with all obtained permits was completed in the end of March 2021. In addition, contract for the purchase of an Amphibious was signed and the respective equipment was officially receipted and tested by the LB in the end of November 2023.

B2 – Based on the received permission for construction, B2 started the works execution in Port of Silistra in the end of May 2023 and finalize it in the end of December 2023, still in process of official reception. Furthermore, B2 succeed to sign also a contract for delivery of a Catamaran for 28 passengers, which was officially delivered and tested from B2 in the middle of November 2023.

B3 - LB has started the procedures to clear the land of the investment, demolishing the existing constructions on site. A contract for execution of the construction works in Borcea arm was signed in November 2021 and the Start Order for works execution was issued in the middle of December 2021. So far, the works execution level as a percentage has reached approximate 80%.

JORIMA (ROBG-415)

Joint risk management and partnership in the border region Calarasi – Dobrich

What’s the goal?

To cover the risk prevention management and to solve potential and existing problems in these areas by using the joint forces of the two neighboring countries instead of each country using only its own resources.

What’s the budget?

800,216.15 euro, out of which 680,183.72 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Dobrichka Municipality Administration (BG)

Beneficiary 2 (B2): Calarasi County Emergency Situations Inspectorate “Barbu Știrbei” (RO)

When is it happening?

Start date: 13.03.2019

End date: 12.12.2022

Duration: 45 months

Where is it happening?

Dobrich in Bulgaria

Calarasi in Romania

How is it going to happen?

  • 1 Strategy and Action plan for common activities against the flood and other natural disaster
  • 1 Joint network of partners for joint early warning and emergency response, including 1 action plan;
  • Purchase and equipment delivery for Dobrichka Municipality for mitigate the negative impact of the natural and other disasters;
  • Purchasing of specific equipment for Calarasi Emergency Situations Inspectorate.

What will be the results (what’s the contribution to the Programme)?

Programme outputs:

456.859 persons benefiting from actions of risk management

456.859 persons benefiting from flood protection measures

11 joint partnerships signed in the field of joint early warning and emergency response

Programme results:

456.859 persons will benefit by the quality of the joint risk management in the CBC area

Project status (reflected in progress reports)

The project was finalized on 12.12.2022. The following results were achieved during the project implementation:

1. In regard to implementation of WP I1 “Purchase and equipment delivery for Dobrichka Municipality for mitigate the negative impact of the natural and other disasters” on behalf of the LB, the tender procedure for purchase of equipment was finalized by signing the contracts for 5 lots for purchase of specific equipment on 13.05.2021. The equipment have been already delivered and accepted by the LB, as follows:

a) For Lot 1 “Acquisition of Roller container with gasoline generator and pneumatic telescopic hook installed in it” – the equipment was delivered and accepted by the Lead Beneficiary on 17.02.2022;

b) For Lot 2 “Acquisition of Drone” – the equipment was delivered on 24.08.2021 and accepted by the Lead Beneficiary on 25.08.2021;

c) For Lot 3 “Acquisition of Specialized fire and rescue equipment” – the equipment was delivered and accepted by the Lead Beneficiary on 17.02.2022;

d) For Lot 4 “Acquisition of Inflatable boat with outboard engine and echo sounder” – the equipment was delivered and accepted by the Lead Beneficiary on 27.09.2021;

e) For Lot 5 “Acquisition of All-terrain vehicles” – the equipment was delivered on 24.08.2021 and accepted by the Lead Beneficiary on 25.08.2021.

2. In regard to implementation of WP I2 “Purchasing of specific equipment for Calarasi Emergency Situations Inspectorate” on behalf of B3, the contracts for equipment purchase have been signed and the equipment was delivered to the beneficiary as follows:

a) Contract from 03.09.2019 for purchase of intervention vehicle. The equipment was delivered to the beneficiary on 06.09.2019;

b) Contract from 11.11.2020 for purchase of network server with operating system license. The equipment was delivered to the beneficiary on 23.11.2020;

c) Contract from 11.11.2020 for purchase of workstations with operating system license and Office type package licenses. The equipment was delivered to the beneficiary on 23.11.2020;

d) Contract from 11.11.2020 for purchase of office package licenses. The equipment was delivered to the beneficiary on 23.11.2020;

e) Contract form 11.11.2020 for purchase of external video surveillance system. The equipment was delivered to the beneficiary on 25.01.2021;

f) Contract from 07.01.2021 for purchase of wall screen. The equipment was delivered to the beneficiary on 27.01.2021;

g) Contract from 06.10.2021 for purchase of UPS 10 000 VA and UPS Workstation. The equipment was delivered to the beneficiary on 25.10.2021 and 26.10.2021;

h) Contract from 06.10.2021 for purchase of display panel, monitors and video projector. The equipment was delivered to the beneficiary on 22.10.2021 and 26.10.2021;

i) Contract from 06.10.2021 for purchase of fixed TETRA radio terminals. The equipment was delivered on 14.10.2021;

g) Contract from 07.10.2021 for purchase of operational intervention vehicles. The equipment was delivered on 23.11.2021;

k) Contract from 03.12.2021 for purchase of printers and multifunctional devices. The equipment was delivered on 31.12.2021;

l) Contract from 03.12.2021 for purchase of switch management 48 ports and rack 42U 800x1000 mm. The equipment was delivered on 31.12.2021;

m) Contract from 24.02.2022 for purchase of 5 Portable TETRA network terminals. The equipment was delivered on 24.03.2022;

n) Contract from 07.07.2022 for purchase of Sound system, including amplifier, diffusor and microphone system - receiver and 2 microphones. The equipment was delivered on 05.08.2022;

o) Contract from 23.06.2022 for purchase of Metal sliding door locker and Mailbox. The equipment was delivered on 04.07.2022;

p) Contract from 07.07.2022 for purchase of Work station, including Windows operating system license, Microsoft Office License and License editor, CDR (CORELL) file reader. The equipment was delivered on 08.08.2022;

q) Contract from 07.07.2022 for purchase of Notebooks – 2 pcs, including Windows operating system license (2 pcs) and Microsoft Office License. The equipment was delivered on 08.08.2022;

r) Contract from 07.07.2022 for purchase of Laptops - 11 pcs, including Windows operating system license and Microsoft Office License. The equipment was delivered on 08.08.2022;

s) Contract from 07.07.2022 for purchase of Audio alarm system. The equipment was delivered on 25.07.2022.

3. The common Strategy and the common Action plan were elaborated and accepted by the LB in May 2020. The documents were translated in English and Romanian language and printed in 100 trilingual copies in March 2021.

4. The first Joint simulation exercise was organized by the LB in the period 29-30.08.2022 in Dobrichka municipality and the second Joint simulation exercise was organized by B3 in the period 13-14.10.2022 in Calarasi county.

5. Promotional materials were elaborated by B3 (indoor and outdoor banners, roll-ups, posters, leaflets and ballpoints pens) and handed to people in order to inform them about the project details and specifics. The project website https://riskmanagement-robg.eu./ was developed, available in Romanian, Bulgarian and English language.

6. Awareness raising campaign. Two information campaigns were organized by the project beneficiaries.

An information campaign was organized by the LB in the period 18-28.10.2022. Trainings among the young people from schools in Dobrichka Municipality and the target groups of the project were organized in locations Karapelit, Batovo, Zhitnitsa, Lovchantsi, Stefanovo, Pobeda, Stojer, Vedrina, Smolnitsa and Bojurovo. During the trainings, there were distributed promotional with information about the actions to be undertaken in case of disasters. Approximately 1.000 people participated to the trainings.

An information campaign was organized by B3 in the period December 2021 – November 2022. Trainings among the young people from schools in Calarasi County and the target groups of the project were organized in the locations Calarasi, Lehliu Gara, Cascioarele, Belciugatele, Oltenita, Chirnogi, Radovanu, Dragos Voda, Dorobantu, Soldanu, Budesti, Gurbanesti, Curcani, Ileana, Ulmeni, Manastirea, Ciocanesti, Chiselet, Spantov, Gradistea, Modelu, Roseti, Dichiseni, Borcea. During the trainings, there were distributed promotional materials with information about the actions to be undertaken in case of disasters. A total number of 3486 people participated to the trainings.

7. Network of partnershipsamong territorial entities involved in civil protection activities was created. The LB signed partnership agreements with the following institutions: Territorial Administrative Unit – Calarasi Town; Directorate General Fire Safety and Civil Protection to the Ministry of Interior, Bulgaria; Dobrich District Administration; Bulgarian Red Cross – District Council Dobrich and the municipalities from Dobrich District - Balchik Municipality, General Toshevo Municipality, Kavarna Municipality, Krushari Municipality, Tervel Municipality and Shabla Municipality. B3 - Calarasi County Emergency Situations Inspectorate “Barbu Știrbei” signed a partnership agreement with the LB – Dobrichka Municipality.

8. Forum for valorisation measures - natural disasters risk prevention measures was organized on 02.12.2022 in Dobrich with 58 participants. The purpose of the Forum was the participants to share the experience in fighting with disaster within the Dobrich-Calarasi cross border area.

Pictures

July 2024
Mo Tu We Th Fr Sa Su
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.