INTEGRATION (ROBG-409)
Preventing forest fire in Dolj and Lom, Montana cross border region
What’s the goal?
The overall objective of the project is to improve joint risk management in the cross-border area by increasing the responsiveness of specific actors in the fight against forest fires in the cross-border area Dolj-Lom, Montana, thus strengthening institutional and technical management capacity in case of disaster and emergency response.
What’s the budget?
941,964.13 euro, from which 800,669.50 euro FEDR
Who is doing it?
Lead beneficiary (LB): Dolj County Council
Beneficiary 2 (B2): Lom Municipality
Beneficiary 3 (B3): INSPECTORATE FOR EMERGENCY SITUATIONS OLTENIA, Dolj
Beneficiary 4 (B4): "Mihai Bravul" Dolj County Inspectorate of Gendarmerie, Dolj
When is it happening?
Start date: 21.07.2020
End date: 20.07.2023
Duration: 36 months
Where is it happening?
Montana (BG)
Dolj (RO)
How is it going to happen?
- Increasing intervention capacity in fighting forest fire in the cross border area;
- Experience exchange in forest fire joint risk management;
- Establishing joint partnerships in the field of risk management situations generated by fire;
- Raising awareness campaign;
- Setting up Lom fire brigade Volunteers for prevention and fire fighting;
What will be the results (what’s the contribution to the Programme)?
Programme outputs: Population benefiting from forest fire protection measures: 50.912 persons; Number of joint partnerships in the field of joint early warning and emergency response: 4;
Programme results: The quality of joint risk management in the CBC area: 3;
Project status
Current Project Status:
The project is currently under implementation and the following progress were registered:
Within the activity T1 – “Increasing intervention capacity in fighting forest fire in the cross border area”, the following equipment were purchased:
1. 3 SUVs with pick-up, by Beneficiary 4 - "Mihai Bravul" Dolj County Inspectorate of Gendarmerie;
2. Special fire fighting protection equipment, by Beneficiary 3 - Inspectorate for Emergency Situations OLTENIA, DOLJ COUNTY;
3. 4 Quadricycles with firefighting system.
LB remade the audibility studies for the warning system and of the electronic alarming sirens. The following step will be the revision of the tender book according to the new studies and the re-launch of the procurement for the alarming system and sirens.
B2 –Lom Municipality launched a procedure for contracting a constructor in order to start works on the building that will serve as the headquarters of the volunteers fire brigade. Also, B2 has conducted a campaign for selecting volunteers for the fire brigade and 10 volunteers have been recruited.