Slide background
Slide background
Slide background

CIVILSAFETY (ROBG-393)

Integrated risk management and efficient reactions of authorities for civil safety

What’s the goal?

The main overall objective of the project is to increase cross border cooperation in emergency prevention and intervention of authorities and to develop infrastructure and joint services to prevent natural and technological disasters, in the same time with developing the capacity to react quickly to threats to the health and integrity of citizens and goods, in order to ensure a safe area, a sustainable development and an increase in the standard of living of the population.

What’s the budget?

988,827.18 euro, out of which 840,503.09 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Territorial Administrative Unit Ovidiu Town (Romania) - 420,897.40 euro

Beneficiary 2 (B2): Shabla Municipality (Bulgaria) – 409,407.64 euro

Beneficiary 3 (B3): Idein Development Foundation (Bulgaria) – 158,522.14 euro

When is it happening?

Start date: 24.07.2018

End date: 23.04.2021

Duration: 33 months

Where is it happening?

Ruse, Dobrich, Constanta

How is it going to happen?                        

  •    Acquisition of special equipment for alerting the population in emergency situations, such as earthquakes, fires;
  •    Development of joint hazard maps;
  •    Organization of trainings and best practice sessions;
  •    Dissemination of information to ensure the increase of public awareness with regard to the protection measures in emergency situation;

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 18,711 people benefiting from actions of risk management; 18,711 people benefiting from flood protection measures; 5,580 people benefiting from forest fire protection measures

Programme results: increase of the quality of the joint risk management in the CBC area

Project status

The Project has been finalized and the main achievements are as follows:

- A vehicle for fire intervention, an ambulance, a vehicle for the transport of 10 or more persons and a rescue boat have been delivered to the LB along with a special equipment for alerting the population in emergency situations, such as earthquakes and fires, all of the equipment is foreseen to be used in case of emergencies, such as floods fires earth quakes, by the volunteers on behalf of LB;

- A rescue boat and a special vehicle for intervention in snowstorms and floods have been delivered to B2, all of the equipment is foreseen to be used in case of emergencies, such as floods fires earth quakes, by the volunteers on behalf of B2;

- The Hazard Maps has been fully developed and can be found at www.hazmaps.eu;

- The volunteers team of 10 persons has been appointed at LB and B2 level and the equipment foreseen within the project for them, in order to be able to communicate between them, receive alerts on cell phones from the warning system, observe and store data from the hazard maps, as well as to be used in trainings and workshops, have been delivered. The trainings of the teams have been organised and performed by the B3.

Pictures

March 2024
Mo Tu We Th Fr Sa Su
26 27 28 29 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.