JORIMA (ROBG-415)

Joint risk management and partnership in the border region Calarasi – Dobrich

What’s the goal?

To cover the risk prevention management and to solve potential and existing problems in these areas by using the joint forces of the two neighboring countries instead of each country using only its own resources.

What’s the budget?

800,216.17 euro, out of which 680,183.74 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Dobrichka Municipality Administration (BG)

Beneficiary 2 (B2): Calarasi County Emergency Situations Inspectorate ”Barbu Știrbei” (RO)

When is it happening?

Start date: 13.03.2019

End date: 12.12.2022

Duration: 45 months

Where is it happening?

Dobrich in Bulgaria

Calarasi in Romania

How is it going to happen?

  • 1 Strategy and Action plan for common activities against the flood and other natural disaster;
  • 1 Joint network of partners for joint early warning and emergency response, including 1 action plan;
  • Purchase and equipment delivery for Dobrichka Municipality for mitigate the negative impact of the natural and other disasters;
  • Purchasing of specific equipment for Calarasi Emergency Situations Inspectorate.

What will be the results (what’s the contribution to the Programme)?

Programme outputs:

456.859 persons benefiting from actions of risk management

456.859 persons benefiting from flood protection measures

11 joint partnerships signed in the field of joint early warning and emergency response

Programme results:

456.859 persons will benefit by the quality of the joint risk management in the CBC area

Project status (reflected in progress reports)

The project was finalized on 12.12.2022.

1. In regard to implementation of WP I1 “Purchase and equipment delivery for Dobrichka Municipality for mitigate the negative impact of the natural and other disasters” on behalf of the BL, the tender procedure for purchase of equipment, launched by the LB in October 2019 was finalized. The equipment have been already delivered, as follows:

a) For Lot 1 “Acquisition of Roller container with gasoline generator and pneumatic telescopic hook installed in it” – the equipment was delivered and accepted by the LB on 17.02.2022;

b) For Lot 2 “Acquisition of Drone” – the equipment was delivered on 24.08.2021 and accepted by the LB on 25.08.2021;

c) For Lot 3 “Acquisition of Specialized fire and rescue equipment” – the equipment was delivered and accepted by the LB on 17.02.2022;

d) For Lot 4 “Acquisition of Inflatable boat with outboard engine and echo sounder” – the equipment was delivered and accepted by the LB on 27.09.2021;

e) For Lot 5 “Acquisition of All-terrain vehicles” – the equipment was delivered on 24.08.2021 and accepted by the LB on 25.08.2021.

2. In regard to implementation of WP I2 “Purchasing of specific equipment for Calarasi Emergency Situations Inspectorate” on behalf of the Beneficiary 3, the following contracts have been signed by the beneficiary:

a) Contract from 03.09.2019 for purchase of intervention vehicle. The equipment was delivered to the beneficiary on 06.09.2019;

b) Contract from 11.11.2020 for purchase of network server with operating system licens. The equipment was delivered to the beneficiary on 23.11.2020;

c) Contract from 11.11.2020 for purchase of workstations with operating system license and Office type package licenses. The equipment was delivered to the beneficiary on 23.11.2020;

d) Contract from 11.11.2020 for purchase of office package licenses. The equipment was delivered to the beneficiary on 23.11.2020;

e) Contract form 11.11.2020 for purchase of external video surveillance system. The equipment was delivered to the beneficiary on 25.01.2021;

f) Contract from 07.01.2021 for purchase of wall screen. The equipment was delivered to the beneficiary on 27.01.2021;

g) Contract from 06.10.2021 for purchase of UPS 10 000 VA and UPS Workstation. The equipment was delivered to the beneficiary on 25.10.2021 and 26.10.2021;

h) Contract from 06.10.2021 for purchase of display panel, monitors and video projector. The equipment was delivered to the beneficiary on 22.10.2021 and 26.10.2021;

i) Contract from 06.10.2021 for purchase of fixed TETRA radio terminals. The equipment was delivered on 14.10.2021;

g) Contract from 07.10.2021 for purchase of operational intervention vehicles. The equipment was delivered on 23.11.2021;

k) Contract from 03.12.2021 for purchase of printers and multifunctional devices. The equipment was delivered on 31.12.2021;

l) Contract from 03.12.2021 for purchase of switch management 48 ports and rack 42U 800x1000 mm. The equipment was delivered on 31.12.2021;

m) Contract from 24.02.2022 for purchase of 5 Portable TETRA network terminals. The equipment was delivered on 24.03.2022;

n) Contract from 07.07.2022 for purchase of Sound system, including amplifier, diffusor and microphone system - receiver and 2 microphones. The equipment was delivered on 05.08.2022;

o) Contract from 23.06.2022 for purchase of Metal sliding door locker and Mailbox. The equipment was delivered on 04.07.2022;

p) Contract from 07.07.2022 for purchase of Work station, including Windows operating system license, Microsoft Office License and License editor, CDR (CORELL) file reader. The equipment was delivered on 08.08.2022;

q) Contract from 07.07.2022 for purchase of Notebooks – 2 pcs, including Windows operating system license (2 pcs) and Microsoft Office License. The equipment was delivered on 08.08.2022;

r) Contract from 07.07.2022 for purchase of Laptops - 11 pcs, including Windows operating system license and Microsoft Office License. The equipment was delivered on 08.08.2022;

s) Contract from 07.07.2022 for purchase of Audio alarm system. The equipment was delivered on 25.07.2022.

3. The common Strategy and the common Action plan were elaborated and accepted by the LB in May 2020. The documents were translated in English and Romanian language and printed in 100 trilingual copies in March 2021.

4. The first Joint simulation exercise was organized by the LB in the period 29-30.08.2022 in Dobricka municipality and the second Joint simulation exercise was organized by B3 in the period 13-14.10.2022 in Calarasi county.

5. Promotional materials were elaborated by B3 (indoor and outdoor banners, roll-ups, posters, leaflets and ballpoints pens) and handed to people in order to inform them about the project details and specifics. The project website https://riskmanagement-robg.eu./ was developed, available in Romanian, Bulgarian and English language.

 

Pictures

June 2023
Mo Tu We Th Fr Sa Su
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 1 2

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.