Slide background
Slide background
Slide background

Romania and Bulgaria join forces to fight Covid-19

The Managing Authority for the  Interreg V-A Romania-Bulgaria Programme issues an instruction to fight the current crisis caused by the pandemic of coronavirus disease (COVID-19).

The projects under implementation, selected under Priority Axis 3 and 5, dealing with risks or health related issues, can now request the modification of the Application Form, in order to use their potential economies for making acquisitions related to the fight against COVID-19.

For these modifications, no addendum to the subsidy contracts needs to be signed, as described in the Project Implementation Manual. The request for the modification of the Application Form will fall under cases regulated in the Project Implementation Manual for which a notification to the subsidy contracts needs to be provided and the deadlines set in it for submitting a request for modification are not mandatory for these specific notifications submitted in order to use the potential economies for making acquisitions related to the fight against COVID-19.

The notifications above mentioned will be verified under the same verification rules as the other types of notifications, so we ask our beneficiaries to submit the modification requests quickly, and we, on the other hand, promise that will analyze them as a priority and the verification and approval deadlines will be minimized.

The Instruction no. 13/23.04.2020 can be accessed here

Published on 23.04.2020

Pictures

November 2024
Mo Tu We Th Fr Sa Su
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.