Slide background
Slide background
Slide background

New Instruction no. 5/28.12.2017, issued by the Managing Authority of the Interreg V-A Romania-Bulgaria Programme. An updated e-MS reporting manual available for beneficiaries

The Managing Authority issued the Instruction no. 5/28.12.2017 for beneficiaries of the Interreg V-A Romania-Bulgaria Programme regarding the obligation of reporting in e-MS for projects contracted under call 1 – Hard and call 2. The Instruction no. 5/28.12.2017 is available here.

Also, the e-MS reporting manual has been modified; the new version is available here.

Both documents are to enter into force from the beginning of January 2018.

Posted on 28.12.2017

Pictures

News

08 July 2024
December 2024
Mo Tu We Th Fr Sa Su
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.