Slide background
Slide background
Slide background

GRADe (ROBG–126)

Joint risk prevention and management system for Gradinari – Malu - Byala communities for a safe and developed cross-border region

What’s the goal?

The project is aiming at achieving a better joint management of the risk situation in cross border area Byala (Ruse, Bulgaria) - Grădinari, Malu (Giurgiu, România)

What’s the budget?

 705,521.22 euro, out of which 599,693.04 euro ERDF

Who?

Lead Beneficiary (LB): Territorial Administrative Grădinari, Commune

Beneficiary 2 (B2): Territorial Administrative Unit- Malu Commune

Beneficiary 3 (B3): Municipality of Byala

When?

Start date: 31.12.2016

End date: 30.03.2019

Duration: 27 months

Where?

Ruse in Bulgaria

Giurgiu in Romania

How?                                                  

  • Creating a joint system for cross-border risk management
  • Purchase logistics and equipment for dealing with emergency situations
  • A joint Guidelines for common management of natural hazards and other emergency situations in Byala, Grădinari and Malu
  • Joint applications in floods, fire and winter-related hazards
  • Awareness campaigns on risk management

Results (what’s the contribution to the Programme)?

Programme outputs: 18.179 people benefiting from actions of risk management, 18.179 people benefiting from flood protection measures, 18.179 people benefiting from forest fire protection measures, 1 joint partnership in the field of joint early warning and emergency response

Programme results: improved quality of risk management

Project status

The project is finalized.

Activities were carried out and the project results are currently being analyzed at Programme level (final report is being verified).  Guidelines for common management of natural hazards and other emergency situations in Byala, Gradinari, Malu have been elaborated. Equipment for all project partners (2 Backhoes, 2 motor pumps, 3 electric power generators, tractor with trailer and snow blade, water and foam truck, portable radio stations and mobile phones tanker) was procured. The tractor and electrical power generator delivered to the LB, however, were not compliant with the technical specifications and the related contracts were terminated. The procurement procedures were relaunched and are ongoing.

A training of the Joint Coordinating Committee members was delivered (Giurgiu) in cooperation with the Cross Border Center for Management and Coordination of the Interventions.  Two working groups in Malu (22.06.2017) and Byala (25.07.2017) were organized as well.

A broad awareness campaign on risk management, including 12 seminars in schools and 4 public debates with public institutions, was implemented in Byala, Gradinari, Malu. The joint applications „Floods” and “Fire” were also organized in Byala (03.05.2018) and Malu (05.06.2018).

You can learn more from the project website: www.graderobg.eu.

Pictures

News

08 July 2024
November 2024
Mo Tu We Th Fr Sa Su
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.