ROBG-135 “Investments for a safe region Giurgiu County and Ruse District”

What’s the goal?

To improve the joint risk management in the cross-border area by providing superior technical conditions that will have a major positive impact on the response speed of the emergency activities and missions in Giurgiu-Ruse region.

What’s the budget?

5,059,800.84 euro, out of which 4,300,830.72 euro ERDF

Target at the half of the implementation period: 103,423 euro

Who is doing it?

Lead Beneficiary (LB): Giurgiu County Council (Romania)

Beneficiary 2 (B2): Fire Safety and Civil Protection Directorate General – Ministry of Interior (Bulgaria)

When is it happening?

Start date: 31.03.2017

End date: 30.03.2020

Duration: 36 months

Where is it happening?

Giurgiu in Romania

Ruse in Bulgaria

How is it going to happen?                      

  • Construction works and endowments : Technical Material Base for Increasing The Response Speed in Emergency situations – Giurgiu; First Regional Office Fire Safety and Civil Protection – Ruse;
  • Events;
  • Trainings;
  • Information and publicity;
  • Procurement of specific equipment.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 1 joint partnership in the field of joint early warning and emergency response; 515,000 people benefiting from actions of risk management, flood protection measures and forest fire protection measures.  

Programme results: increasing the efficiency of emergency situations interventions, performed in a shorter time, with less or no blockages, lower costs of operations and more secure equipments to be used in the rescuing missions.

Project status

The Lead Beneficiary signed the contract no.50 / 12.03.2018 for the elaboration of the technical project and the work execution with SC CONSIG SA and ING PROIECT MANAGEMENT SRL through the leader SC CONSIG SA (the value of the works - 6.128.313,31 lei with VAT, technical - 130,900 lei with VAT).

The lead beneficiary stated that after the elaboration of the technical project, the designer issued on 22.06.2018, an analysis by the internal evaluation commission of the Giurgiu County Council was needed. Following the verification, technical and financial changes were observed and the value of the works exceeds by approx. 1,000,000 Lei the value offered in public procurement works.

As the Lead Beneficiary stated, on September 10, 2018, he requested a point of view of the National Agency for Public Procurement to overcome the value of the winning bid with approx. 20% (the total value of the works in the signed contract - 6.128.313,31 lei with VAT). On 14.09.2018 the Agency sent a reply to the Lead Beneficiary. A reformulated application was sent to NAPP on September 14, 2018, and the Lead Beneficiary is waiting for the answer.

Therefore, the Technical Project is not yet accepted and, after the National Public Procurement Agency will present its point of view, it is possible to launch a new procurement procedure for about 7% from 20% (the percentage exceeding the value of the winning bid) due to the fact that these works could be separated and executed by other manufacturers and the legislation (NAPP Ordinance no.3 / 2017) allows the winning bidder to exceed the value offered by no more than 15%.

It should be noted that the Lead Beneficiary is unable to complete the construction works in due time, given the fact that the remaining implementation period is 16 months, while under the signed contract, the period of execution of the works is 20 months. All this is in the context of the aforementioned situation, which is not yet resolved.

The rest of the activities are implemented according to the program. Information and publicity contracts, organization of events were signed by the Lead Beneficiary, and contracts for office equipment, promotional materials and engineering were signed by B2.

According to the information provided by the B2 representative, the contract for drawing up the technical design contract and the contract for the execution of the works was signed, but it was not reported / uploaded in the eMS system.

Extending the implementation period of the project was considered, but the Lead beneficiary will prepare the request for amendment and supporting documents after the National Public Procurement Agency will present a point of view on public works.

Social Media

 

Pictures

March 2019
Mo Tu We Th Fr Sa Su
25 26 27 28 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.