Ceilings

The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 20.10.2020, which can be downloaded here.

For the previous ceilings of expenditures which are no longer in force - Version 4, used when drafting the full application forms under the third call for proposals, Version 5 in force since 10th of January 2018 and Version 6 in force since 24th of February 2020 click here (EXCEL/ PDF).

For the previous ceilings of expenditures which are no longer in force but were used when drafting the applications – Version 1, 2 and 3 click here (EXCEL/ PDF).

The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 14.02.2023, which can be downloaded here.

 

 

Pictures

August 2026
Mo Tu We Th Fr Sa Su
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6