Better connected Euroregion Ruse-Giurgiu – eMS 130

“Development of River Danube for better connectivity of the Euroregion Ruse-Giurgiu with Pan-European transport corridor No 7”

What’s the goal?

The main objective of the project is to ensure safety transport through the improvement of the transport water infrastructure of Danube river between Giurgiu and Ruse.

What’s the budget?

7.349.963,06 euro, out of which 6.247.468,60 euro ERDF.

Target at the half of the implementation period: 238 600 euro for LB, 111 388 euro for B2.

Who is doing it?

Lead Beneficiary (LB): Ruse Municipality (BG)

Beneficiary 2 (B2): Territorial Administrative Unit - Giurgiu Municipality (RO)

When is it happening?

Start date: 12.05.2017

End date: 11.11.2019

Duration: 30 months

Where is it happening?

Ruse, Bulgaria

Giurgiu, Romania

How is it going to happen?                      

  • acquisition of equipment and services;
  • rehabilitation of the piers of the passenger terminal Ruse center and improving the navigation conditions of the three berths;
  • construction of a quay in Giurgiu Municipality;
  • measures for joint strategy planning in CBC region.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 8 km of improved inland waterway, 1 joint strategy for improvement of safety navigation on the Lower Danube

Programme results:  1.83% of the RO-BG CBC Danube length where safety of the navigation has been improved by joint actions

Project status

The technical design was elaborated in June 2017 and the works execution have been also awarded since September 2017. The building permit was requested in July 2017 and granted in August 2018 by the Minister of Regional Development and Public Works. The construction works started in September 2018. The progress in the works execution has reached nearly 30% in early February 2019.

Following a lengthy evaluation of the 4 tenders submitted by the deadline, Beneficiary 2 awarded the contract for technical design elaboration, works execution and technical assistance by the Designer at the end of May 2018. The technical design was delivered to B2 on 25.07.2018. The related building Permit was obtained in October 2018 and the works commencement certificate was issued on 18.10.2018.

Pictures

August 2019
Mo Tu We Th Fr Sa Su
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.