BC-TENT (ROBG-383)

Better connected secondary and tertiary nodes to TEN-T core and comprehensive network through joint CBC measures

What’s the goal?

The project main objective is to improve traffic conditions, safety and conductivity between secondary and tertiary nodes and core TEN-T infrastructure in the cross border area through the modernization of 5.087 km of local and regional roads of cross-border importance.

What’s the budget?

4,769,687.25 euro, out of which 4,054,234.14 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Veliko Tarnovo Municipality (Bulgaria)

Beneficiary 2 (B2): Territorial Administrative Unit Calafat Municipality (Romania)

Beneficiary 3 (B3): Future Today Association (Bulgaria)

When is it happening?

Start date: 10.12.2019

End date: 31.12.2023

Duration: 48 months and 22 days

Where is it happening?

Vidin, Veliko Tarnovo in Bulgaria

Calafat, Dolj County in Romania

How is it going to happen?

  • Modernization of 5.087 km of local and regional roads of cross-border importance, which directly connect the secondary and tertiary nodes on both sides of the Danube to the basic TEN-T infrastructure;
  • Coordinating the mechanisms for overcoming the new common challenges arising from the operation of the core TEN-T infrastructure on Pan European corridors 4, 8 and 9;
  • Organizing awareness-raising activities with the support of NGOs for the safety of citizens in places where the heavy burden of road traffic meets the local population.

What will be the results (what’s the contribution to the Programme)?

Programme outputs:

- 5.087 km of reconstructed or modernized roads;

- 3 common mechanisms to facilitate the connection of secondary / tertiary nodes to the TEN-T infrastructure, namely: Elaboration of a traffic safety measures report, applying route guidance and implementation of an awareness raising campaign of safety.

Programme results:

- 85,854 cross-border population served by modernized infrastructure leading to TEN-T.

Project status

Current Project Status:

The implementation period of the project ended on 31.12.2023, but because of the delays registered at the investment activity of LB, the project was included on the list of non-functional projects. The new completion date of the project is 31.12.2024.

LB finalized the process of requesting / obtaining the approvals from the Ministry of Regional Development and Public Works for the Technical Design. The investment objective of LB is divided in 3 sub-sites. For sub-sites no. 1 regarding Opalchenska Street and no. 2 with the streets network, LB signed the works contracts in 24.08.2023. For sub-site no. 1, the works execution will take 270 days from the opening of the construction site and determination of the construction line and level of works. According to the Action plan provided by LB, the opening of sub-site no. 1is expected to take place in July 2024, while the works will be finalized in December 2024. For sub-site no. 2, the construction works will be performed in 120 days from the opening of the construction site and determination of the construction line and level of works. The Protocol no. 2a for the opening of sub-site no. 2 was issued on 23rd of October 2023. According to the information provided by LB, the execution of the works for sub-site no. 2 will be finalized in March 2024.

For sub-site no. 3, LB signed the works contract and gave the order to start the works on 04.07.2023. The construction works for sub-site no. 3 are ongoing.

B2 finalized the construction works on his behalf and reported as achieved 0.51 km of modernized roads in Calafat. The reception at the end of the construction works on behalf of B2 took place on 21st of September 2023. In addition, B2 reported a value of 16,809 people served by the modernized Jiului Street for the Result indicator.

B3 finalized the implementation of 2 joint mechanisms to facilitate the connection of secondary/tertiary nodes to TEN-T infrastructure, namely the awareness raising campaign on safety and the traffic safety measures mechanism. In regard with the route guidance mechanism, from the 3 traffic smart board delivered by B3, only 2 were installed, while the one delivered to LB was not installed yet because the construction works on his behalf are ongoing. The report on traffic safety measures can be found at the following links:

1. https://www.vidin.tv/?p=13223

2. https://lachezara-tv.eu/bg/2023/06/01/

3.https://veliko-tarnovo.bg/bg/evrofinansirane/mezhdunarodni-proekti-s-uchastieto-na-obshtina-veliko-tarnovo/proekt-po-dobre-svrzani-vtorichni-i-tretichni-tochki-v-glavnata-mrezha/

Pictures

March 2024
Mo Tu We Th Fr Sa Su
26 27 28 29 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.